COVID-19 update

City of Prospect has taken a number of important and proactive steps to protect our community and staff as we face this unprecedented situation of the global COVID-19 Coronavirus pandemic and the nationwide Public Health Emergency.

We need to take all reasonable steps available to protect our community, our Elected Members, our staff and volunteers (and their families) against the spread of this infection while ensuring we deliver services as close to ‘business as usual’ as possible.

Find out more.

Dismiss alert

Charles Cane Reserve - Previous Updates

Progress Update – 29 September 2020

Following some final changes to the design, construction has commenced at Charles Cane Reserve with temporary fencing in place to secure the three works zones across the site.

Council’s contractor, Outside Ideas, will aim to get through the following program of works over the next two week period: (29 September – 12 October)

  • Locating and pot holing of existing services.
  • Demolition of bollards and railing within work zones.
  • Strip and dispose turf within work zones.
  • Detailed excavation and boxing out to design levels within Entry Plaza and Fitness Hub Areas.
  • Base preparations to pavement areas in Entry Plaza and Fitness Hub Areas.
  • Formwork and steel work for both concrete bench seats along edge of Entry Plaza and Fitness Hub.
  • Electrical trenching and placement of conduits for pedestrian lighting and BBQ.
  • Placement of pipe for water supply to new drinking fountains.

Please see the concept plan package here for more information on what is being constructed.

Charles Cane Reserve Perspective